Skip to content
PlanningPathFree check

Do I need planning permission for a solar panels in Westminster City Council?

Typical answer

In most cases, solar panels in Westminster City Council fall under Permitted Development rights (Part 14 Class A), but require Prior Approval from the Local Planning Authority before works start. Key factors include Article 4 restrictions, conservation-area designation, and compliance with the specific thresholds set out in the General Permitted Development Order 2015 — check these carefully before proceeding.

Source: Part 14 Class A — legislation.gov.uk · Verified 2026-04-19

Check my specific property

Free five-minute check. No account needed.

Permitted Development rules

Part 14 Class A thresholds

These are the key numerical limits under Part 14 Class A of the General Permitted Development Order 2015. Your project must satisfy all of them to qualify as Permitted Development.

ClauseRuleLimit
A.1(a)Equipment protrusion beyond wall or roof slope planeMax protrusion (m): 0.2
A.1(ba)Flat-roof equipment height above roof peakMax above roof peak (m): 0.6
Source: Part 14 Class A — legislation.gov.uk

Westminster City Council planning data

Local planning facts

Approval rate

0.8%

Below average for householder applications

Source: MHCLG Planning Statistics (PS2)

Planning application fee

£548

Householder application (national fee)

Reviewed April 2026 · gov.uk source

Submission portal

Portal link not yet listed for Westminster City Council. Use the national Planning Portal.

Get a verdict for your specific property

The rules above apply nationally. Your assessment checks your specific address against Article 4 directions, conservation area boundaries, and listed building status — in under five minutes.

Check my specific property →

Free assessment · Optional LDC letter add-on